R.L. Mlazgar Associates has asked the Fourth Circuit to block collection of a roughly $9.25 million net judgment while it appeals a contract verdict favoring HLI Solutions, the former Hubbell Lighting business now part of Current. The request reached the Richmond-based court on November 3, after a 30-day automatic stay expired on October 1, and a September request to extend it in South Carolina went without a ruling.

The underlying judgment was entered August 31 by Judge Jacquelyn D. Austin. Hubbell Lighting won $10,724,878 on its breach-of-contract counterclaim. Mlazgar won $1,478,848 under South Carolina’s sales representative statute, half of it punitive. After the offset, the Minnesota agency owes about $9.25 million.

Stay request and financial arguments

Mlazgar wants collection paused until February 18, 2027, and has asked to file its balance sheet under seal. It says two pending matters could reduce the net figure: a fee petition seeking $3,843,818 and a request for $319,616 in prejudgment interest, both still before the Greenville court.

The agency also points to a January 19 trial in Minneapolis against Focal Point. Its lawyers say a large recovery there could help it post security. Hubbell Lighting dismissed those concerns as unsupported, using the legal term “ipse dixit,” and cited a 2010 South Carolina ruling that refused a stay despite the debtor’s claimed inability to pay. A judgment holder, Hubbell argued, should not be forced to fund an appeal on an unsupported hope of later payment.

Summary reversal and contract arguments

Along with the stay, Mlazgar filed a motion for summary reversal—a procedure that lets an appeals court discard a judgment without full briefing when the issues are manifestly unsubstantial. The agency is seeking that relief after a nine-day jury trial and a $10.7 million verdict.

Mlazgar argues that the exclusivity clause it breached is an unenforceable non-compete under South Carolina law and that a separate contract provision bars Hubbell Lighting’s lost-profit damages. Hubbell Lighting called the motion meritless and close to frivolous. It said the district court rejected the liability argument three times and noted that Mlazgar cited no case from any circuit in which a jury verdict was summarily reversed.

Cooper deck and lost-profit evidence

Hubbell Lighting is also using a Cooper Lighting slide deck to rebut Mlazgar’s claim that its breach did not cause the lost profits. The deck is dated October 9, 2020, about five weeks before Mlazgar’s agency announced it would take on Cooper Lighting. It was sent by then-Cooper executive Shane Bickley under the subject line “Mlazgar Rollout.”

One slide carried the heading “Conversion of Hubbell business from prior Mlazgar relationships.” The deck outlined a 30-day launch plan, including a step to convert Hubbell stock positions at Mlazgar strongholds. It also described a “Market Blitz” aimed at the top 20 contractors, distributors and specifiers, with emphasis on customers holding existing Hubbell Lighting projects, and a promotion meant to encourage quick conversions from Hubbell.

Hubbell filed the deck under seal in Greenville last month; in the Fourth Circuit, it is on the public docket. Hubbell says the deck shows that Mlazgar and Cooper were planning, before the breach, for the same losses Hubbell later incurred.

Trial exhibits and scale of recovery

Exhibits from the August trial show the limits of the Focal Point alternative. In 2019, the last full calendar year before the dispute, Mlazgar and Elan Lighting—the Wisconsin agency Mlazgar later acquired—represented Focal Point and sister company Kenall. Those two lines generated about $333,000 and $149,000 in commissions. In the same year, Mlazgar earned approximately $941,000 in commissions representing Hubbell Lighting.

A Minneapolis award equal to one to three years of the combined Focal Point and Kenall commissions would land in the mid six figures to low seven figures, a fraction of the $9.25 million owed to Hubbell. That would cover only a small part of the balance.

Next steps

Mlazgar can reply before a three-judge panel considers the stay. The panel could grant a temporary pause, deny it, or leave the matter with Judge Austin, who has had the September request for eight weeks. For lighting agencies, the case puts a sharper focus on the cost of exiting a manufacturer relationship and on how much security an appeal may require.

FL

Farida Lindqvist

Farida covers industrial high-bay, canopy, street, area, flood, wall-pack, and sports luminaires, focusing on how mounting height, optical distribution, and environmental limits shape real installations. Her analysis uses IES photometric files, illuminance and uniformity calculations, beam angle, IP ratings with test basis, input voltage, and model-specific safety or performance records to compare fixtures and identify missing evidence. She helps lighting distributors, electrical contractors, facility managers, and project specifiers evaluate luminaire selections, mounting plans, and specification packages before sampling or ordering.