Pepco signs direct lease for 55,619 m² at CTPark Bucharest West

The retailer will run a regional distribution centre from CTP's Bucharest West industrial park, serving Romania and wider Central Eastern Europe.

CTP has signed a lease with retailer Pepco for 55,619 m² (598,677 ft²) at CTPark Bucharest West in Romania, converting Pepco’s occupation of the building into a direct partnership with the developer.

Pepco will operate a regional distribution centre from the site, serving the Romanian market and the wider Central Eastern Europe region. It had previously occupied the building through a third-party logistics provider.

Direct lease structure

The agreement gives Pepco a long-term direct lease at the park and reinforces CTPark Bucharest West’s role as a strategic logistics hub for regional distribution, according to CTP. The park is described by CTP as the largest industrial park in continental Europe, with approximately 1.5 million m² (about 16 million ft²) of planned lettable space.

Andrei Marian, business development director at CTP Romania, said Pepco’s choice reflected the location’s strategic importance. He added that the move to a long-term direct lease confirmed a strong relationship and that CTP had worked closely with Pepco to tailor a solution to its operational requirements and distribution network. Marian also said CTP valued the confidence Pepco had placed in it as a long-term partner.

The lease covers a substantial block of space at a park positioned for regional distribution, while Pepco’s shift from a third-party arrangement to a direct lease gives it a more direct relationship with the landlord. The lease term, rental value and commencement date were not disclosed in the statement.

CR

Camila Restrepo

Camila Restrepo covers conveying, sortation, telescopic loading, and palletizing systems used in distribution centers and order-fulfillment buildings. She analyzes conveyor speed, unit load per meter, sortation peak rate, SKU and order structure, merge and divert behavior, and accumulation buffer sizing against measured throughput and jam-recovery time rather than catalog maximums. Her work helps intralogistics engineers and warehouse operations directors size conveying and sortation capacity, define FAT and SAT acceptance conditions, and plan controls recovery for realistic peak windows.